Tunnel crews meet under the Bering Strait and join the Spine's two halves eleven centimetres off line

After six years and eighty-six kilometres, two boring machines broke through to each other beneath the seabed. When the cable is in, two years from now, the transmission spine will run as one conductor path from Asia to the Americas.

By Ken Nakashima · Bering Strait · Filed 08:26 · Friday · November 27 · Received via L4 relay
Telemetry 5,422 · Tech

The cutterhead on the western machine stopped turning at nineteen minutes past three in the morning, and for a while nobody at the face said anything, because after six years of grinding the silence was the strangest sound the tunnel had ever made.

Then the air moved. It came through a probe hole no wider than a thumb, cold and gritty with rock dust that had been cut from the other end of the strait, pushed along by the Alaska drive's ventilation fans, which run a little harder than the Chukotka ones. Vera Tynenkeu, who has run the western drive since its first ring of lining segments, held her palm over the hole and laughed, and then held it there longer, as if to be sure.

That draught was the first thing ever to cross the Bering Strait underground. It crossed fifty metres beneath the seabed, at the end of two bores driven toward each other from Cape Dezhnev and Cape Prince of Wales, and it arrived through rock that the eastern machine had stopped short of on purpose, so that the last metre could be opened by hand.

The crews did not wait for the metre. When the breaker crews had widened the probe hole to the size of a forearm, Sam Ahkinga, chief of the Alaska drive, reached through from his side and Vera took his hand, and they shook through the rock with the rest of the face standing around them in the work lights. "His glove was wet," Vera said afterward. "Our side is dry. That was how I knew it was really him."

The survey teams came forward an hour later, when the gap was clear. Both bores were steered by laser traverse and gyro-theodolite over eighty-six kilometres, checked against a survey shaft sunk on Little Diomede in the second year, and the two centrelines met eleven centimetres apart, most of it vertical. The lining crews will take that up over the next forty rings. A brass survey mark now sits in the tunnel crown at the meeting point, stamped with both teams' coordinates, which disagree in the last digit.

It is the longest tunnel under any sea. It is also, for now, only a hole. The superconducting cable that will run through it, two cryogenic conductors in a vacuum jacket with cooling stations at each portal and one on the Diomede shaft, will take another two years to pull. Until it is energised, the transmission spine of the Helios Grid stays in two halves, joined only by the Solaria Array's beams overhead, a borrowed connection, and the beams, as anyone who stood in the Atacama control room this winter will remember, can walk off their aim. The rock stays where it was cut.

The first thing carried through the new gap was a cable gauge: a steel ring machined to the outer diameter of the jacketed cable plus its pulling clearance, which will be dragged the full eighty-six kilometres to find any place the conductor would bind. Osei, who came from the commons to oversee the pull and who has spent three decades walking the same corridors at the same hours, carried it through himself, west to east, ducking under the rock lip with the ring held out in front of him like something borrowed.

On the far side he set it down on the invert, checked that it sat level, and wrote the time in his notebook.

"Nineteen minutes past four," he said. "The first hour of a two-year job."

Responses · 2
KiranMehta_Skeptic · 6h

Eighty-six kilometres of tunnel, six years, and the press release leads with the eleven centimetres as if that's the story. Who holds the bonds on the Spine, and how much of the Helios Grid's cheap power ends up paying for it through the Gaia Ledger's audit fees?

BenedictHouse · 7h

An eleven-centimetre miss over eighty-six kilometres is well inside the tolerance the consortium's engineering protocols set for this class of bore, and the joint survey data will go through independent review before anyone calls it a triumph. Until the peer-reviewed alignment figures are out, I'd rather not hear people treat a press photo as a result.