Stellar Dispatch
LIVE RELAY L4 · Δ 6:22 LIGHT 22:46 · FRI NOV 20 Timeline Ask the record Subscribe

New Kanem lights its own furnace and pours the colony's first steel beam

Every structural member in the youngest colony has so far come in a freighter's hold; this one was made from local iron on local power, though the alloying metals still come from elsewhere and the next pour is weeks away.

By Tavita Faleolo · New Kanem · Filed 08:25 · Friday · November 20 · Received via L4 relay
Telemetry 5,353 · Off-World

The steel came down the runner at a little past the second bell of the day shift, white at the lip and then the colour of a late sun as it filled the mould, and for the eleven minutes it took to pour, nobody in the melt shop at New Kanem said anything at all.

I stood on the catwalk above the casting bay with some forty others, behind a rail the shop foreman had chalked with a line we were not to lean past. Below us the colony's arc furnace, drawing its current from New Kanem's own reactor and not a watt from anywhere else, had melted a charge of iron refined here from ore dug here. What came out of it was a beam six metres long and 1.4 tonnes in weight, the first structural steel ever made in this colony, which is now in its second decade and has until today raised its walls, its frames and its pressure bulkheads from members that crossed the dark in a freighter's hold.

"We have been a port that receives," said Mustapha Goni, the melt master, when the ladle was swung clear and he had taken off his visor. "Today we sent something out of our own hands. Small thing. One beam." He held up a single finger, then laughed and put the visor back on.

The beam will not go far. It is cut to length as the lintel over the entrance of the new school gallery, the long room on the colony's east ring where the rotation council has promised the children a place to see the sky, and it will be bolted in once it has cooled and passed its hardness and ultrasonic checks. While it still threw heat you could feel from the catwalk, the furnace crew went down one at a time with long-handled holders and wrote their names along its flank in heat crayon. There are fourteen names. Goni's is last and smallest.

Solenne Akintola, head gardener of the L4 gardens, watched from the end of the catwalk. She is here advising the colony on the planting of the school's courtyard, and the gallery the beam will span opens onto it. "Somebody will walk under that every morning for the rest of their childhood," she told me. "Gardeners think about that kind of thing. What is overhead when you are small."

What the furnace cannot yet do

The crew offered the limit themselves, and freely. New Kanem can now make iron and can now melt it, but it cannot yet make the manganese, vanadium and chromium that turn iron into structural steel. Those alloying metals still arrive by freighter, weighed out in sealed drums, and the drums used today held the colony's whole present stock. The second pour, Goni said, is weeks off. The furnace must be relined and its electrodes replaced, and the alloy store will stay empty until more cargo comes in.

A ship that can mend her own sails still buys rope from the chandler, and New Kanem is that ship this evening, with one sail of its own making. Until the freighters bring the drums, the furnace sits cooling in its bay like a hull in a slip.

By the end of the shift the beam had gone from orange to a dull iron grey, and the chalked names were still legible on its side.

Responses · 2
RosieWealth · 5h

Viktor, the opt-out is a clean slogan, but the real number here is freight: at current lift rates on the Orbital Exchange, the imported alloys will cost several times what the local iron does. Local power plus local ore is the right direction, and the economics only close once someone builds the alloy supply next to the furnace.

AdelineOst · 8h

Rosie is right about the freight, and Meridian's own yards have already cut alloy lift by roughly a third by smelting closer to the ore. A structural beam poured in weeks, with a working count of its tolerances, is worth more than a decade of committee estimates about steel nobody has yet made. Earth's institutions keep promising this sort of thing from the same leaders they had when the promises were first made.